Jacksonville Veterans Memorial Arena Times-Union Center for the Performing Arts EverBank Field Prime F. Osborn III Convention Center Baseball Grounds of Jacksonville Ritz Theatre And Museum
 

News & Announcements

Main Street Bridge Closure

June 23, 2017 4:19 pm

Main Street Bridge will be closed June 23-25

 

Main Street Bridge closures:

Friday, June 23 at 6:30 p.m. through Sunday, June 25 at 6 a.m.

Monday, Tuesday, Thursday, and Friday nights (June 26, 27, 29, and 30) from 6:30 p.m. until 6 a.m. and Wednesday night, June 28 from 9 p.m. until 6 a.m.

Both vehicular and pedestrian traffic will be detoured to the Acosta Bridge. Signs will direct traffic through the detour. Boaters will not be impacted by the closures.

 

The bridge will remain in the down position from June 26 at 6:30 p.m. until June 28 at 6:45 a.m., and June 28, 29, and 30 at 6:30 p.m. to 6:45 a.m. Vessels are encouraged to check the Local Notice to Mariners from the United States Coast Guard for additional information. Boaters will be unable to request a bridge opening during this time, however the channel will remain open to smaller boats. The channel restrictions are necessary for crews to install a new wire rope which is used to raise and lower the movable bridge.

The improvements to the Main Street Bridge include the replacement of several major mechanical components, replacement of the entire electrical control system, replacement of the traffic gates, sidewalk gates, lightning protection system, and closed-circuit television cameras that give operators live views of traffic conditions. The work will include new heating and air conditioning units, water and sanitary sewer lines, and floor tile for the control house.

 

*Information provided by FDOT Northeast Florida.